About this tool
Build a quotation or a ranged estimate with materials and labour lines, contingency, tax, validity and a payment schedule.
This generator prices a job line by line — quantity times rate, less any line discount — then applies an overall discount pro rata before tax, adds a contingency percentage as its own visible line, and splits the result into a payment schedule whose milestones always sum exactly to the total. It produces either a quotation, which states one fixed price, or an estimate, which states a range around that figure using the variance you set. Materials and labour are totalled separately, which many trades have to show, and a validity date is calculated so the offer has a clear expiry.
Open Quotation and Estimate Generator on AltFTool — it loads instantly in your browser.
Provide your input — an image, text, or data.
Let the tool analyze or generate the result.
Review, refine, and reuse the output wherever you need it.
Spreads an overall discount across every line first, so the tax charged reflects what the customer actually pays.
The final payment absorbs rounding, so the schedule sums to the quoted total to the cent.
Switches between a single fixed price and a range, and labels the document accordingly.
A quotation is a fixed price: if the customer accepts it in writing, you are generally bound to do the work for that amount. An estimate is a considered forecast that can move, which is why it is presented as a range. Say clearly on the document which one it is, because consumer law treats them differently.
Thirty days is the usual period, because material prices and labour availability change. State the expiry date on the document rather than leaving it open — once it passes you can requote without going back on your word.
Before. Tax is charged on the amount the customer actually pays, so the discount reduces the taxable value first and the tax is then worked out on the reduced figure. Applying a discount to a tax-inclusive total overstates the tax you would have to remit.
It depends on how well the job is defined: 5% to 10% is common for well-scoped work, 15% to 20% for renovation and refurbishment where hidden conditions are likely. Showing it as its own line is more defensible than quietly inflating the rates, and it makes the conversation about scope easier.