Gantt Chart Maker
Make a Gantt chart online: tasks, start and end dates, dependencies, milestones and a today line. Import/export CSV, download PNG or A4/Letter PDF. Free.
Still loading. If the tool doesn’t appear, reload this page.
About this tool
Gantt Chart Maker
Make a Gantt chart from tasks, dates, dependencies and milestones, with a today line. Import or export CSV and download a PNG or A4/Letter PDF.
A Gantt chart maker turns a list of tasks with start and end dates into horizontal bars on a calendar, so you can see how long each task runs, what overlaps and what waits on what. This one adds finish-to-start dependencies, milestones, a today line, CSV import and export, and PNG or A4/Letter landscape PDF downloads, all in your browser.
How to use Gantt Chart Maker
- 1
Name the chart, then edit the example tasks or press Add task and Add milestone to build your own list
- 2
Set each task's start and end dates; tick Milestone for single-day markers such as a sign-off or launch
- 3
Type the numbers of the tasks each row waits on in Depends on, and fix any loop or date error the tool lists
- 4
Press Push dependants later to move tasks that start before their predecessors finish, keeping each task's length
- 5
Pick A4 or Letter and press Print, PDF or PNG, or Export CSV to keep the plan as a spreadsheet
Why use Gantt Chart Maker
Dependencies you can check
Each task lists the task numbers it waits on. Loops such as A → B → C → A are refused with the loop spelled out, and a task that starts before its predecessor finishes is flagged.
Push dependants later in one click
The scheduler moves each task to the day after everything it depends on has finished, keeps its length, and never pulls a task earlier than you set it.
Spreadsheet in, PDF out
CSV import reads common column names such as Task Name, Finish and Predecessors; export writes a plain CSV and the chart downloads as PNG or a landscape A4 or Letter PDF.
Common use cases
- You are planning a six-week website launch and need one picture that shows design waiting on research and build waiting on design sign-off
- Your plan lives in a spreadsheet and you want a printable chart for a meeting without setting up project software: save the sheet as CSV and import it
- A date slipped and you need every dependent task pushed back by the same amount without retyping each one
Frequently asked questions
How is a task's duration counted?
Durations are inclusive calendar days: a task from Monday 2 March to Friday 6 March 2026 lasts 5 days, and a task that starts and ends on the same date lasts 1 day. The weekday count (Monday to Friday) is shown beside it, but bars are drawn on the calendar, so weekends are not skipped.
What kind of dependencies does it support?
Finish-to-start only, which is the most common type: a task can start the day after every task it depends on has finished, and a milestone can fall on the day its predecessors finish. Start-to-start, finish-to-finish, lag and lead times are not modelled.
What happens if two tasks depend on each other?
The chart is not drawn and the loop is listed, for example Design → Build → Design, because no order of dates can satisfy it. Remove one of the links and the chart appears again.
What CSV format does it import?
A header row followed by one task per row. It needs a name and a start column and also reads id, end, milestone, depends_on and progress, accepting names such as Task Name, Start Date, Finish, Predecessors and % Complete. Dates can be YYYY-MM-DD, YYYY/MM/DD or DD.MM.YYYY, and progress may carry a % sign. Dependencies are plain task ids separated by semicolons, commas or spaces; link types and lags such as 2FS+3d are not read.
Should I use a Gantt chart or a list of dated events?
Use a Gantt chart when work has durations, overlaps and tasks that wait on other tasks: bars show each task's length and arrows show what must finish first. For a sequence of single dated events, such as a history or a launch announcement schedule, the Timeline Builder on this site is the simpler fit.
Is my project plan uploaded anywhere?
No. The chart is built in your browser and the plan is saved as a draft in this browser's local storage so it survives a reload. Clear all deletes it. CSV files you import are read on your device and never sent to a server.
How do I get a printable Gantt chart?
Choose A4 or Letter and press Print, PDF or PNG. Print and PDF use landscape pages; a long plan that would shrink below half size continues on further PDF pages. The chart is always printed on a white page, whatever theme you use on screen.